- Thank you received: 0
Timetable
- j.jones1812
- Topic Author
- Offline
Less
More
11 years 3 months ago #3606
by j.jones1812
Timetable was created by j.jones1812
Hi.
I am trying to use the new 3.0 version with my existing timetable (2 week cycle) but it is synchronised to the wrong week (we are in week B today,but timetable for week A is showing ). Is there any way of setting this?
Also, the schedule view doesn't match the timetable for some reason.
I am trying to use the new 3.0 version with my existing timetable (2 week cycle) but it is synchronised to the wrong week (we are in week B today,but timetable for week A is showing ). Is there any way of setting this?
Also, the schedule view doesn't match the timetable for some reason.
- Nathan
11 years 3 months ago #3618
by Nathan
Replied by Nathan on topic Reply to above
With reference to iDoceo messing with your calendar/planner.......I had the same problem yesterday and was getting frustrated. I messed the whole thing up. Luckily I had a backup to restore it.
Have you tried going into schedule and then into calendar? Then manually copy the correct week. Then you need to tell it to repeat every 2 weeks. Didn't think mine was going to work but I have Sussed it out and it works perfectly now.
Needs someone sat with you showing I think! My colleague and I worked it out together.
Good luck, I'm sure Bert will be along soon to help
Have you tried going into schedule and then into calendar? Then manually copy the correct week. Then you need to tell it to repeat every 2 weeks. Didn't think mine was going to work but I have Sussed it out and it works perfectly now.
Needs someone sat with you showing I think! My colleague and I worked it out together.
Good luck, I'm sure Bert will be along soon to help
- Chach